Second Floor Done


After losing three more days to rain, we are back on track!  Intellistructures spent one day building the upper level floor system and one day putting the second floor together.  That leaves the roof panels to be set, which will hopefully happen on Monday.  By then, we will have the SIPs shell and be ready for roof dry-in and outsulation to be attached.  Similar to the foundation, two inches of EPS foam will be attached to the outer skin of the SIPs panel going from roof, walls down to where we left off on the foundation walls.  Stay tuned!

2nd Floor North View

2nd Floor South View

Interior View

12 Inch (R-46) Roof Panels

Advertisements

More SIPs Construction


The speed of SIPs construction is impressive.  It’s only Day 3 and the project is already looking more like a house.  Here are some pics of our progress this week.

Day 2

Day 2-2

Day 3

Setting LVL Beam

Forklifting upper level panel

Finishing upper level