Second Floor Done


After losing three more days to rain, we are back on track!  Intellistructures spent one day building the upper level floor system and one day putting the second floor together.  That leaves the roof panels to be set, which will hopefully happen on Monday.  By then, we will have the SIPs shell and be ready for roof dry-in and outsulation to be attached.  Similar to the foundation, two inches of EPS foam will be attached to the outer skin of the SIPs panel going from roof, walls down to where we left off on the foundation walls.  Stay tuned!

2nd Floor North View

2nd Floor South View

Interior View

12 Inch (R-46) Roof Panels

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: